Project    youth welfare office, Senftenberg

Home «  office «  Project New-build youth welfare office in Senftenberg

jugendamt_front jugendamt_left jugendamt_fenster jugendamt_innen  
Architectur: modern administration building with atrium, central topic: use of daylight and renewable energies
Offices: flexible division, can be altered later, floor space from 12 to 100 m²
Façade: structural glazing façade with sun protection glass; some sections with slats between panes, back as rear-ventilated SG façade
Builing services: heating and cooling using geothermal energy by means of 8 vertical ground heat exchangers, each to a depth of 100m low operating costs, chilled ceilings as thermoactive building component Daylight-dependent interior lighting, intelligent building automation
Energy-efficient: natural lighting, thus less energy required for workplaces and general lighting. Implements EU Directive on the ‘Energy performance of buildings’
Built for: Oberspreewald Lausitz district
Provided: phases 1 - 8 pursuant to the German Fee Structure for Architects and Engineers (HOAI), fire protection concept
Completed: September 2007
Overall costs: 2,1 m €